Polycote UK’s Quickline EP is a high quality quick drying esterbased epoxy coating formulation designed to allow the shortest possible downtime when demarcating heavily trafficked areas such as car parks, paths, walkways and cycle ways.
Quickline EP has a matt finish and will withstand heavy traffic in only 20 mins.
Typical Uses
It is ideal for use on roads, pedestrian crossings, car parks, helipads, runways, as well as general linemarking in warehouses and factories.
Suitable substrates
Quickline EP has been specifically designed to adhere to almost any road surface including asphalt, concrete, tarmac, blacktop, block paving etc.
Colour
Quickline EP is available in 6 standard colours. Other bespoke RAL colours are available, but may be subject to minimum quantities.
Packaging
Quickline EP is supplied in 20kg units.
Application TemperatureAbove 5°C
Curing Times at 15°C
Touch dry10 minutes
Foot traffic15 minutes
Vehicular traffic30 minutes
Full cure90 minutes
Recoat1-2 hours
Coverage (5kg)480 linear metres at 100 mm wide, based on 2.4 m² per kg coverage
Shelf life6 months
StorageStore between 5°C and 20°C in a cool, dry, frost-free environment away from sources of ignition.
Please consult the technical data sheet for full technical product data.
How to apply Quickline EP (video)
Preparation
Do not apply this product if the surface is damp, wet or frosty.
Ensure surfaces are clean, dry and free from any loose material. Remove any contamination, including dust, oil and laitance.
New concrete must be allowed to fully cure before overcoating. It is recommended that new tarmac is allowed several months to weather before painting. In all cases, a small area should be tested before application.
If Quickline EP is to be used on synthetic surfaces (i.e. sports pitches, etc.) or where previous line markings exist, we strongly recommend testing on a small area to check the substrate or previous coating will provide a sound bonding to the new product.
Application
Mix thoroughly before use.
Quickline EP can be applied by a lining machine, airless spray (tip size 11-13 thou), conventional spray or brush for small areas or lines.
If the concrete/tarmac is particularly porous, a thinner first coat should be applied to seal the surface. This should then be followed by another coat applied 1-2 hours after the sealer coat. A minimum thickness of 150 microns is recommended.
Application Temperature
Quickline EP should not be applied if the air or surface temperature is below 5°C. The surface temperature must always be at least 3°C above the dew point, throughout the application & curing period. Do not apply if the surface is wet, or if rain, mist, fog, or snow is expected during the drying period.