HyGlaze Supa-C is an aliphatic solvent-based UV stable two part epoxy wall coating designed for maximum chemical resistance.
Its specialised formulation enables a thickness of up to 0.5mm to be achieved easily in two coats.
Designed for areas of harsh or extended chemical attack, HyGlaze™ Supa-C is formulated specifically as a wall coating for chemical bunds and industrial environments.
- Can be applied to concrete, render, brick, aluminium, and steel
- Designed for maximum chemical resistance
- Available in 12 colours
Designed for areas of harsh or extended chemical attack, HyGlaze™ Supa-C is formulated specifically as a wall coating for chemical bunds and industrial environments.
Suitable substrates: Following application of the appropriate primer, HyGlaze™ Supa-C may be applied to concrete, render, brick, aluminium and steel.
Colour: HyGlaze™ Supa-C is available in a selection of 12 stock colours, or in a large range of BS4800 and RAL specifications (subject to minimum quantity). We can make it to your specification on any order over 30 units.
Packaging: HyGlaze™ Supa-C is supplied in pre-measured quantities as a two part 5.0kg unit, comprising an epoxy resin blend Part ‘A’ and hardener Part ‘B’.
Pot life: 30 mins @ 20°C
Normal application temperature: 15°C – 20°C
Cure time: Re-coat, minimum 16 hours and max 36 hours. Full strength achieved after 7 days
Light traffic – 16 hours
Medium traffic – 48 hours
Full chemical cure: 7 days
Number of parts supplied: 2
Coverage: Approximately 4m²/kg per coat, up to 20m² per 5kg unit, will depend on the surface porosity and its texture.
Priming: The surface should be primed with Polycote Hyglaze WD Primer, depending on the type of substrate. Should the time lapse between priming and top coat exceed 48 hours, abrade the primer to ensure intercoat adhesion.
Please consult the technical data sheet for full technical product data.
Surface Preparation
THOROUGH SUBSTRATE PREPARATION IS ESSENTIAL.
Prior to application of HyGlaze™ Supa-C, the surface should be primed with Polycote EP Primer or WD Primer, depending on the type of substrate.
Please contact Polycote Technical Helpline and prepare the surface in accordance with the appropriate primer Data Sheet.
Should the time lapse between priming and top coat exceed 48 hours, abrade the primer to ensure intercoat adhesion.
Mixing
Prior to mixing, both components should be kept at a temperature between 15°C and 20°C.
Having fully prepared the substrate, stir the individual components before mixing together. As pigment may ‘sink’, ensure that the mixing is very thorough and from the bottom of the container.
Add the hardener to the coloured resin and thoroughly mix for at least 5 minutes. For best results use a heavy duty slow speed drill with a mixing paddle.
Application
Apply by brush, roller or squeegee, making sure that the surface is completely covered. Always ensure a constant wet edge and work within the pot life of the material.
Make sure the coating is not overlapped in any area and apply in one direction only. Two coats are recommended in areas of high chemical aggression.
The ambient temperature of the areas should not fall below 10°C throughout the application and curing period.
Application Temperature
Normal application temperature range is between +15°C and +20°C.
The maximum substrate and atmospheric relative humidity should be 75%.