Hyglaze Bund Coat is an aliphatic solvent-based UV stable polyurethane coating with excellent abrasion and chemical resistance and has good weathering properties. It is available with a gloss finish as standard. Suitable for chemical bunds as well as general floor areas. Ideal for industrial and commercial floors and chemical process industries.
- Applied by brush, roller or squeegee
- Can be applied to concrete, render, brick, aluminium and steel
- Totally impervious jet washable coating
- Twin pack solvent based polyurethane
- Suitable for internal & external use
Designed for areas of harsh or extended chemical attack, Hy-Glaze™ Bund Coat is suitable for chemical bunds as well as general floor areas. It is ideal for industrial and commercial floors and chemical process industries.
Suitable substrates:
Colour
Packaging:
Following application of the appropriate primer, Hy-Glaze™ Bund Coat may be applied to concrete, render, brick, aluminium and steel.
Hy-Glaze™ Bund Coat is available in a selection of 12 stock colours, or in a large range of BS4800 and RAL specifications (subject to minimum quantity). We can make it to your specification on any order over 30 units.
Hy-Glaze™ Bund Coat is supplied in pre-measured quantities as a two part 5.0kg unit, comprising an epoxy resin blend Part ‘A’ and hardener Part ‘B’.
Number of parts: 2
Application Temperature: +15°C and +20°C.
Pot Life @ 20°C: 20 – 30 minutes
Initial Cure: 12 hours (light pedestrian traffic), 24 hours (light wheeled traffic), 48 hours (heavy duty traffic)
Re-coat time: 16 hours (min). 48 hours (max)
Coverage: Approximately 6m² to 8m²/kg per coat, 33-40m² per 5kg unit, will depend on the surface porosity and its texture.
Please consult the technical data sheet for full technical product data.
Surface Preparation
THOROUGH SUBSTRATE PREPARATION IS ESSENTIAL.
Prior to application of Hy-Glaze™ Bund Coat, the surface should be primed with Polycote EP Primer or WD Primer, depending on the type of substrate. Please contact Polycote Technical Helpline and prepare the surface in accordance with the appropriate primer Data Sheet. Should the time lapse between priming and top coat exceed 48 hours, abrade the primer to ensure intercoat adhesion
Mixing
Prior to mixing, both components should be kept at a temperature between 15°C and 20°C.
Having fully prepared the substrate, stir the individual components before mixing together. As pigment may ‘sink’, ensure that the mixing is very thorough and from the bottom of the container.
Add the hardener to the coloured resin and thoroughly mix for at least 5 minutes. For best results use a heavy duty slow speed drill with a mixing paddle.
Application
Apply by brush, roller or squeegee, making sure that the surface is completely covered. Always ensure a constant wet edge and work within the pot life of the material.
Make sure the coating is not overlapped in any area and apply in one direction only. Two coats are recommended in areas of high chemical aggression. The ambient temperature of the areas should not fall below 10°C throughout the application and curing period.
Application Temperature
Normal application temperature range is between +15°C and +20°C.
The maximum substrate and atmospheric relative humidity should be 75%.